Week 4, Day 2

July 7th, 2015


The kids started their morning with a drawing charrette, in which they all broke up into groups and constructed blueprints for their own Tiny House designs, a activity they all had a lot of fun with. On the job site today the campers were split up into three groups. Two groups were inside, one working on framing the windows for installation, and the other nailing in the furring for the bathroom wall. The other group was outside of the house working on installing the rest of the plywood around the houses walls. It was a really hot and humid day so we had to make sure we made time for plenty of water breaks but even though the temperature was up it was still a good day of hard work!

Designing their own Tiny House blueprints

Designing their own Tiny House blueprints

IMG_0402

Nailing in the furring

Nailing in the furring

Yes..that is a dianosour playing the keyboard.

Yes..that is a dianosour playing the keyboard. Artwork by Liam. 

Plywood, plywood, and more plywood!

Plywood, plywood, and more plywood!

Advertisements